From brief to working plan
Project Architect turns project context into an editable delivery structure. It can start a new draft or load an existing project, generate phases and tasks, connect the right teams, model dependencies and show the plan as a board, timeline or predictive dashboard.
The generated result is a starting structure, not an automatic commitment. Every phase, task, role, duration, dependency and expense remains reviewable before the draft is activated.
Give Architect enough project context
- 1Choose the project source
Start a new draft or continue an existing project from Project source.
- 2Select a direction
Choose Marketing, Design, Development, Consulting, Strategy, Research, Operations, Mixed or let Architect infer the direction.
- 3Add industry and goal
Describe the intended outcome, market context, constraints and what must be true when the project succeeds.
- 4Choose a start date
The date anchors the generated schedule. It does not replace the project's sprint cadence or total duration.
- 5Set collaboration context
Choose the appropriate team setup and answer clarifying questions when the brief leaves important delivery decisions open.
- 6Generate structure
Architect creates typed phases, tasks, roles, dependencies and, where relevant, expenses for review on the board.
Edit the plan on the Board
- Drag a task between phases or reorder it inside a phase; dependency lines update with the board.
- Select a phase to edit its title, description and duration or to add a task or expense.
- Select a task to edit its outcome, description, duration, phase, specialists, role hours and dependencies.
- Use Board tools to add phases, tasks, expenses and dependencies or to apply Auto layout.
- Use zoom controls for the board itself; opening or closing side panels does not change the plan data.
- Save draft preserves the editable plan without making it an active delivery commitment.
Use the three views for different decisions
| View | Best for | What to check |
|---|---|---|
| Board | Editing structure and ownership | Phases, task detail, roles, expenses and dependencies |
| Timeline | Reviewing sequence and schedule | Start date, phase ranges, task order and dependency pressure |
| Dashboard | Reviewing plan readiness | Delivery confidence, staffing fit, timeline pressure, coverage, risk and commercial logic |
Plan with real team capacity
Find teams proposes staffing options from the brief. You can choose a ready option, attach one or several teams, inspect their members and then assign only relevant specialists or roles to each task.
When the project tracks hours or costs, the inspector shows the planned workload and modeled cost. When those capabilities are off, Architect removes those controls instead of inventing commercial data.
- 1Review Team options
Compare the proposed staffing paths before attaching a team.
- 2Attach the required teams
Teams on this project remain visible and can be expanded without breaking completed work.
- 3Assign tasks deliberately
Choose a specialist or role for each task and check workload concentration in Dashboard.
- 4Confirm or request participation
Own teams can be confirmed; external teams receive the appropriate project request before activation.
Complete an internal core with Hybrid team mode
Choose Hybrid team when the project already has useful internal people but still lacks role coverage, specialist evidence, market experience, language fit or available capacity. This mode uses the same professional assembly engine as Teams Canvas, with the project brief and plan as additional evidence.
Start by attaching your own team. Architect locks those profile IDs, evaluates what they already cover and returns ranked standalone team variants containing the core plus only evidence-backed additions. It does not combine several AI variants or silently replace your people.
- 1Select Hybrid team
The team section first shows your saved teams because a real internal core is required.
- 2Attach the core
Choose one or more owned teams. Architect records their professionals as locked members for this staffing decision.
- 3Generate or review the plan
Add enough brief and task context for Architect to understand required outcomes and capabilities.
- 4Find missing specialists
Compare complete hybrid options ranked against the same project. Weak or unsupported gaps remain visible instead of being filled by unrelated profiles.
- 5Apply one option
Select the strongest single composition, edit role and workload assignments, then continue the normal request, save and activation flow.
Correct a plan without starting over
Correct draft opens a controlled revision workflow. Add the change you need, define the target budget when commercial data is available, and generate targeted clarification questions for ambiguous corrections.
The revision keeps the existing project context. Review the changed board, timeline and Dashboard before saving or activating it.
Move from draft to delivery
- 1Review Board metrics
Check task count, phase structure, role coverage, duration and any modeled hours or costs.
- 2Resolve critical risks
Fix missing ownership, impossible dependency sequences and overloaded roles before sending requests.
- 3Save the draft
Give the draft a clear project title and preserve the reviewed structure.
- 4Confirm teams or send requests
Participation state remains visible in the project editor.
- 5Activate deliberately
Activation creates the working project boundary. Continue daily execution in Project Workspace.