Collty Help

PROCESSES, PROJECTS AND DELIVERY

Create company and process operating reports

Present recorded process runs, KPI observations, exceptions and controls in Keynote Studio.

01

Choose the company or process

  1. 1
    Open Keynote Studio → Businesses

    Choose an authorized Business Architect model. Use Operating report scope to select all company processes or a particular process and its subprocesses.

  2. 2
    Review the snapshot

    Start with the operational assessment and evidence gaps. Process definition states, run states, exceptions and configured controls have separate diagrams; KPI charts use dated numeric measurements with their own units and recorded targets. Check capture time and coverage before interpreting totals.

  3. 3
    Present and download

    Choose presentation or A4 format, inspect the rendered pages and download PDF. Source detail tables are an optional appendix in Presentation settings. Save a presentation to retain that version; it does not update itself when the operating ledger changes. Regenerate an older report from its source to include newly recorded evidence and current charts.

02

Separate process design from actual performance

SourceInterpretation
Process definition and ownerThe intended operating model, not proof that work was completed.
Process runsRecorded states of the included executions.
KPI observationsActual recorded values with dates; a KPI definition alone is not a measurement.
ExceptionsRecorded issues and their states within the included execution scope.
ControlsConfigured governance, distinguished from evidence that a control was performed.
03

Read the coverage limits

The report is an as-of snapshot, bounded to the latest 200 runs, 1,000 KPI observations and 2,000 exceptions linked to those runs. Detail tables show smaller excerpts and disclose their included counts. Counts describe the included evidence, not lifetime totals.

Missing observations are unavailable, not zero. Reports with no execution evidence say that performance cannot be assessed and show configuration readiness and next steps instead of empty findings pages. One KPI measurement can be compared with its recorded target but cannot establish a trend. Definitions, actual runs and configured controls remain separate. Use Business plan for strategy and accepted financial forecasts; use Finance for posted financial performance.

Was this guide useful?Help us keep the instructions clear and current.